Product Name 
Price  To 
Address:D2 Building,DaLinGang industrial Zone,Tianhe district,GuangZhou city, GuangDong province
Tel:86-02-82309490 82525004
Fax:86-20-82184298
Email:jiabaogz@163.com
Web:http://www.jbhuojia.com
Guangzhou shelves: shelf column is how to produce
Article Type:Logistics Information  Publish Time:2015-6-11 15:28:13

      Rack column is how to produce out? Rack column production and processing steps, all materials warehouse shelves are from steel production of cold rolled steel, cold rolled steel shelf factory bought width generally 800-1250mm, because the shelf column forming size is only 55 * 47 * 2.0 80 * 60 * 2.0,90 * 70 * 100 * 70 * 2.0 and 2.0 of these types, so we were slitting the future size of the material corresponding to the desired width, then after slitting cold-rolled steel from the forklift to before automatic punch, punch open the Rack column-shaped hole out of cold-rolled steel required, currently the most widely used form of shelf post hole diamond hole, good punch holes into the column material strip before rolling through the cold rolling mill Rolling rolled into the desired shaped hole.

     So the length of the shelf column is how to control it? Also in the mill synchronization is complete. Such a number of shelves full column on the process as well. However, because the power storage shelves in the final column on the floor, so it needs in the post-position welding contact with the ground floor, through such a series of processes, a shelf post processing has been basically completed step become, finally, Surface treatment shelves, shelf surface treatment is generally pickling, spray plastic to complete.

Site Management  siteMap  Friends Links
Copyright Notice © Guangzhou preferred remains of logistics equipment Co., LTD All rights reserved.
Guangzhou preferred remains of logistics equipment Co., LTD
D2 Building,DaLinGang industrial Zone,Tianhe district,GuangZhou city, GuangDong province